Summum's very first pyramid is about to be torn down.
This area will host the sanctuary which will be underground.
The little pyramid is gone.
A storage garage is cleaned out before tearing down.
Hauling stuff away.
The storage garage is gone. Time to dig out some concrete.
Everything is clear.
Heavy machinery moves in and starts digging some deep holes.
That is one deep hole.
A crane is used to drop steel I-beams into the holes.
One by one the holes are dug and the beams are dropped in.
The steel beams are in position.
Thick wooden panels are slid between the beams.
The hole is dug and the wood panels form a box keeping the sides from caving in.
The concrete floor is poured.
The sides of the sanctuary are formed.
Quartz crystals are placed into the sides.
The side forms are in place. Now it's time to fill them with concrete.
The crypts are built. This is where the mummiforms will go.
Looking up through the shaft that leads to the entrance.
The entrance is fitted with a bank vault door.
Waterproofing is applied to the sides of the sanctuary.
Preparing the roof of the sanctuary. Look at all that rebar.
The concrete roof is poured.
More waterproof protection is placed around the santuary and the sides are filled in with dirt.
The steel beams are removed.
More dirt is placed against the sides.
The shaft is covered with an aluminum roof. We are finished for now. Later we'll start the landscaping.